Sunday, January 7, 2018

Weather and Holidays Got in the Way...

Like a lot of the country it got shivering cold here in Missouri... But I got the daughters permission to put the wagon back in the shop after New Years so I could get back to work.

I've gotten the cabinets I'll have hung, along with the lights and ceiling paneling. 

Also built what I'll call my "power center" panel that I mounted beside the side door. 

It has the remote monitor of the batteries and solar power system, several light switches (only 3 of the 6 currently wired up) and a fuse panel for as many as ten circuits.

Not a whole lot left to do really. Just building my convertible couch/bunk, a counter up under the cabinets and a couple other odds and ends.

So far I'm pretty happy with how it's coming along... even with the bad weather and the crowded work space. (The shop is also living space while they build their house) 😉

Time to heat up some supper...

Getting Restless to get back on the road!
Brian